Concrete
Descriptions |
| CN01 |
A Tied Concrete Shoulder |
|
Portland Cement
Association 20 Minutes |
|
|
|
This video discusses the
I-20 project in South Carolina from Georgia state line Northeast toward Aixen
which was 6 miles. It involved the
undersealing of existing concrete pavement on I-20 and the full-depth repair
of about 800 yards of pavement. |
|
|
| CN02 |
Alkali-Silica Testing |
|
Strategic Highway Research
Program 20 Minutes |
|
|
|
This
video explains that Alkali-Silica reactivity (ASR) is one of the major causes
of cracking on concrete and discusses it by:
1. Determination 2. Prevention 3. Testing (new and conventional). |
|
|
| CN03 |
Bituminous Concrete Paving |
|
Washington Department of
Transportation 45 Minutes |
|
|
|
Describes three areas of
construction inspection: preliminary checks and equipment; surface
preparation and tack coats; and delivery of hot-mix paving, compaction, and
final product acceptance. Procedures and inspection requirements are in
accordance with Washington State DOT standards, but general information
applies. |
|
|
| CN04 |
Concrete Pavement Overlays |
|
Strategic Highway Research
Program 22 Minutes |
|
|
|
This tape gives a detailed
presentation of materials, methods, and procedures for banded overlays and
non-branded overlays. Methods for
choosing procedures and related testing methods are discussed. |
|
|
| CN05 |
Early Openings of Full-Depth Concrete Repairs |
|
Strategic Highway Research
Program 10 Minutes |
|
|
|
This
video discusses the major considerations for early openings in concrete
repairs and although fast setting concrete will be used the real secret is
planning, scheduling, and evaluating.
|
|
|
| CN06 |
Field Testing for Quality Control in Fresh
Concrete |
|
Portland Cement
Association 59 Minutes |
|
|
|
This video exhibits the
importance for quality control with fresh concrete. |
|
|
| CN07 |
Finishing and Curing Concrete |
|
Portland Cement
Association 30 Minutes |
|
|
|
This video recommends
different practices for finishing and curing concrete to ensure optimum
moisture content. |
|
|
| CN08 |
Freeze Thaw Testing |
|
Strategic Highway Research
Program 25 Minutes |
|
|
|
Freezing and thawing are
some causes of concrete deterioration.
This video covers the causes and prevention of freeze/thaw as well as
conventional and new tests. |
|
|
| CN09 |
Full-Depth Repair of Jointed Concrete |
|
Strategic Highway Research
Program 18 Minutes |
|
|
|
Five major topics relating
to repair of jointed concrete pavement: distress requiring full depth repair,
field survey, transverse joint design, materials, and repair procedures. |
|
|
| CN10 |
Partial-Depth Repair of Concrete Pavement |
|
Strategic
Highway Research Program 15
Minutes |
|
|
|
This
video demonstrates repair of spells at joints and mid-sections of concrete
pavements. Materials and procedures are shown for
repair of damage limited to the upper third of the concrete slab. High early-strength concrete mixes are
discussed, and the repair process is demonstrated. Tests are shown for deterioration and determination of repair
boundaries. Surface preparation is
demonstrated, including options for removal of materials, cleaning, and
application of a bonding agent to the repair site. Finally, placement and consolidation of the concrete,
finishing, and curing procedures are presented. |
|
|
| CN11 |
Patch PCC with PCC and with Bituminous
Materials |
|
Utah Department of
Transportation 23 Minutes |
|
|
|
This video explains the nine
steps to properly repairing small cracks on highways: marking the area, saw cutting, excavating,
cleaning, placing joint material, coating with epoxy to bond with old
concrete, placing concrete, finishing, and curing. |
|
|
| CN12 |
Quality Control of Concrete -On Site Part 1 |
|
Strategic Highway Research
Program 14 Minutes |
|
|
|
This video discusses methods
for the field sampling and testing of concrete for temperature and slump. |
|
|
| CN13 |
Quality Control of Concrete -On Site Part 2 |
|
Strategic Highway Research
Program 17 Minutes |
|
|
|
This video discusses methods
for the field sampling and testing of concrete for air content and unit
weight. |
|
|
| CN14 |
Quality Control of Concrete -On Site Part 3 |
|
Strategic Highway Research
Program 18 Minutes |
|
|
|
This video presents new
methods developed by SHRP for the field sampling and testing of
concrete. Testing is divided into two
areas: As-Delivered Concrete, using water content measurement and thermal
effects evaluation, and As-Placed Concrete using maturity monitoring. |
|
|
| CN15 |
Quality Control of Concrete -On Site Part 4 |
|
Strategic Highway Research
Program 18 Minutes |
|
|
|
This video presents new
methods developed by SHRP for the field sampling and testing of
concrete. Additional testing
As-Placed Concrete include temperature-matched curing, pulse velocity
testing, and nuclear density testing. |
|
|
| CN16 |
Recycling Concrete |
|
Minnesota Department of
Transportation 20 Minutes |
|
|
|
This video discusses
concrete recycling in Minnesota from Worthington 16 miles north to Fulda and
indicates a savings of $600,000 compared to conventional methods. |
|
|
| CN17 |
Recycling Continuously Reinforced Concrete
Pavement |
|
North Dakota Department of
Transportation 20 Minutes |
|
|
|
This video explains the I-29
(North bound lane only) recycling project of concrete for aggregate in new
concrete. The job is 10.4 miles long
and the existing pavement is 9" continuously reinforced with asphalt
shoulders. |
|
|
| CN18 |
Testing Ready Mixed Concrete in the Field |
|
Construction Materials
Engineering Council, Inc. 58
Minutes |
|
|
|
This training tape contains
up-to-date instruction on the 7 required ASTM's for fresh concrete testing.
Additionally, both wet-sieving and beams are covered, and a special section
individually addresses consolidation. |
|
|
| CN19 |
White Topping |
|
Portland Cement
Association 40 Minutes |
|
|
|
This video discusses the
I-70, Sherman County, Kansas white-topping project consisting of: 1. The existing pavement 2. Its distress 3. Location of the project
4. Length of project 5.
Project projected cost. |
|
|
| CN20 |
The Slump Test |
|
ADOT Video Production
Services 10 Minutes |
|
|
|
This video is demonstrating how to perform a
concrete slump test. |
|
|